Decommission Industrial Gas Boiler

 

Phase 1 - Two Gas Boilers Ready for Decommissioning

Project: Decomissioning of Industrial Gas Boiler

This project shows the removal of old industrial Gas Boilers from a factory in Milton Keynes. Once all the pipework had been made safe the boiler was removed and sent for scrap.

Once the boilers are disconnected from Gas, Water, Electricity and the Flue, we then manoeuvred the boilers through the small wooden doors on the left of the picture.

 

Return to Projects..


Phase 2 - Disconnecting Water Supply

Project: Decomissioning of Industrial Gas Boiler

Welding equipment used for disconnecting water supply.

 

 

Return to Projects..


Phase 3 - All Disconnected and Ready for move

Project: Decomissioning of Industrial Gas Boiler

Special low level rollers are put into position under the boiler ready for the move.

 

 

 

Return to Projects..


Phase 4 - Hand Winching the Boiler

Project: Decomissioning of Industrial Gas Boiler

We used a hand winch to slowly move the boiler as you can see from the photo. The picture also shows a man lubricating the rollers.

 

 

Return to Projects..

 