 |
Project:
|
|
 |
Project:
Development of an 11 bedroomed, 7 bathroom mansion style property with heated swimming pool.
|
|
 |
Project:
Sympathetic development of 19 luxury house within listed building of the building of the cottesmore hunt.
|
|
 |
Project:
Gas fired Combination Boilers. Heating system to radiators. Provision of high quality sanitary and brassware to Bathrooms and Ensuites
|
|
 |
Project:
Sympathetic refurbishment of 17th Century Northampton House, converting to Day Care Nursery
|
|
 |
Project:
Riverside Development of fifty five apartments in cluster blocks. Gas fired condensing system. high quality sanitary and brassware to bathrooms and ensuites boosted cold water system and infrastructure throughout
|
|
 |
Project: Supply and installation of contract sanitary and brassware. Above ground wastes.
New housing development of 85 properties, ranging from six bedroom detached properties to 2 bed flats.
|
|
 |
Project:
Hot water generation and istibution to public toilets flats and showers plus high pressure washdown to consulting and operating areas.
|
|
 |
Project:
New build Day Care Nursery heated by gas fired boilers with LST radiators throughout with all requisite controls
|
|
 |
Project:
Stylish and contemporary development of thirty three 2 bedroomed Apartments over three floor, with top floor penthouse
|
|
 |
Project:
Part of a refurbishment to a beautiful 16th
Century House nr Gatow. Installation consisted
of Heating system with hot and cold water as
well as Gas installation.
|
|
 |
Project:
New Mansion near Rugby which required: Heating
Hot & Cold water systems, Sanitry ware,
Lux Installations, Lead flashing, spa, steam
room and swimming pool Heating.
|
|
 |
Project:
The new Hamworthy system was mounted on a plinth
with all Gas and Water work carried out so the
Hamworthy Boilers could work in unison.
|
|
 |
Project:
This project shows the removal of old industrial
Gas Boilers from a factory in Milton Keynes.
Once all the pipework had been made safe the
boiler was removed and sent for scrap.
|
|
 |
Project:
We installed 4 domestic water storage tanks
in a loft space which provided extra water storage
throughout. The picture shows the usage of foil
faced insulation for lagging the pipework.
|
|
 |
Project:
The under floor heating system was part of
a new building project at Northampton School
for Boys. We used a Veissman Boiler with Wersbro
under floor piping system.
|
|
 |
Project:
The pipework installed in a new 40 bedroom
old peoples home in Ascot. The images show the
attention to detail we put into every job even
though the pipework will eventually be covered
over and never seen again.
|
|
 |
Project:
Twenty one brick built flats at The Folly in
Hertford. The installation included: Gas, Hot
& Cold water systems, lead flashing and
Radiators & Boilers
|
|
 |
Project:
For the boiler house installation we used Viestmann
Gas Boilers. The project included Gas, Water,
Electricity and the boiler Flume.
|
|
 |
Project:
This Boiler was installed in Central Milton
Keynes. We used 4" and 3" welded pipework
and a new stainless steel flue.
|
|
 |
Project:
New pub in Central Milton Keynes installed
with Air Conditioning Units and all domestic
services which included: Hot & Cold Water
system, Heating system, Gas, Kitchen fit for
Cookers, Hot plates and Deep Fat fryers.
|
|
 |
Project:
The Heating Installation in Bristol was a complete
refurbishment which meant we had to decommission
the old system to install a new economical Heating
system. Pictures in this project show the raw
start to the finished office.
|
|
 |
Project:
High level gas piping installed in factory
warehouse unit to supply gas for high level
heating system.
|
|
 |
Project: 's
This project shows the installation in the
office and boiler house in Northampton. The
picture shows the pressurised Heating System.
|
|
| |
|
|
|
|
|